How to install active part of single-phase pole mounted transformer ?

Before I dive in though I'd like to invite you to like this video, click subscribe and hit the notifications bell.
The installation of the active part of a single-phase pole mounted transformer mainly includes the following steps:
1. Formulate and prepare an installation plan
2. prepare the required tools and materials, including lifting equipment such as cranes and hoists, common tools such as screwdrivers, wrenches, and parts such as copper bars, wires, and grounding devices.
3. carry out on-site investigation of the installation site, determine the installation position and orientation[ˌɔːriənˈteɪʃn], check whether the foundation meets the requirements, and check whether there are any safety hazards at the site, etc.
4. use lifting equipment such as cranes or hoists to lift the active parts and oil tank and place it on the pre-prepared foundation.
5. connect the cables and wiring. Link leads of the primary winding and secondary-winding to the corresponding leads deom junction box Then, connect the links. and insulate them with insulating tape or grounding sheath (if have).
6. Carry out the grounding device installation. connect the oil tank with the grounding device.
That all for the installation of the active part of a single-phase pole mounted transformer
And finally, if you have any questions, don't hesitate to get in touch by leaving your queries [ˈkwɪəriz]in the comments section.
We read them all and will do our best to help.